Posts

Showing posts from February, 2023

2023/2/28 3rd and McCracken

Image
Forming the top and placing rebar for the 2’6”x11 box Breaking asphalt on 3rd street  Breaking asphalt on Riverside  Pipe installation from 24”x48” box across Riverside  Completing top for 2’6”x11’ box  Continue to break asphalt on 3rd street

2023/2/27 3rd and McCracken

Image

2023/2/24 3rd and McCracken

Image
Continue with FM heading south on 3rd street  Prepping for the Garrison branch, box walking trail floor and box culvert top concrete pour Concrete pour went well 

2023/2/22 3rd and McCracken

Image
Rain day for contractor 

2023/2/21 3rd and McCracken

Image
Concrete pour for walls of 3rd street box Placed several more sticks of pipe for the force main. Heading south on 3rd street Compaction for the new Finley park entrance  Continue to pack new entrance for Finley park 

2023/2/20 3rd and McCracken

Image
Building forms for box on 3 rd street  Excavating for force main

2023/2/17 3rd and McCracken

Image
Installation of water line and tapping into existing  Covered box culvert floor from yesterday’s pour

2023/2/16 3rd and McCracken

Image
Concrete pour for the 3rd street box culvert  Continue to set up rebar for the curb around 48x24 storm box at Finley park  Continue with force main south on 3rd street  Almost finished with 3rd street box floor

2023/2/15 3rd and McCracken

Image
Installation of rebar today for a possible concrete floor pour tomorrow  Prepping 24x48 box for a head wall Excavating and preparing to shut water down on Friday and attach new line