Arrived at 7:35am for concrete pour at 8am, foreman let me know plant was having issues and will be late. Truck arrived at 9:15, I tested the concrete: Air 5%, Slump 4-3/4” and Temp 90. Made three cylinders. Pour went well. Lee will meet contractor and Asphalt contractor to discuss paving today as well.

2023-8-24 3rd & McCracken

Image
  Arrived at 7:50am and Concrete was onsite, i tested concrete: Slump 4", Air 5.5%, and Temp 91°. made three cylinders. Pour went good, will pour again tomorrow morning.

2023/8/17 3rd and McCracken

Image
Pour concrete trail

2023/8/16 3rd and McCracken

Image
Contractor stripping bridge deck.

2023/8/15 3rd and McCracken

Image
Stripping the deck

2023/8/14 3rd and McCracken

Image
Continue to pour more of concrete trail

2023/8/11 3rd and McCracken

Image
Getting ready to pour concrete trail 

2023/8/10 3rd and McCracken

Image

2023/8/9 3rd and McCracken

Image
Rain 

2023_8-8 3rd & McCracken

Image
  Contractor was forming up Trail coming off Bridge on McCracken and heading to Third Street

2023/8/7 3rd and McCracken

Image
Pouring curb for side walk on the South side of bridge  Removing riprap from stream